Home / Resources

Lidaer ground screw systems

Position. Install. Connect.

Understand the installation sequence and the information your project team should review.

Lidaer hero reference

01 / Foundation planning

A clear installation sequence.

01
Position

Set out the foundation locations against the project layout.

02
Install

Use matched equipment and the agreed installation method.

03
Connect

Review levels and attach the specified connection.

02

Project information

Make the review specific.

Use this checklist to prepare the information for your enquiry.

Review area Information to share
Application Structure type, support arrangement and connection
Site Location, access and available soil information
Product Proposed model, quantity and dimensional requirements
Records Available drawings, reports and installation information
03

Related resources

Keep the next step connected.

Product selection

Product selection

↗

Review the product and connection information.

Explore
Installation guidance

Installation guidance

↗

Understand the sequence and equipment discussion.

Explore
Testing and documents

Testing and documents

↗

Request project-relevant technical information.

Explore

Start a conversation

Let’s find the right system.

Share the application, site information and connection requirements. Our team can help you prepare the next step.

Talk to our team