01 / Foundation planning
A clear installation sequence.
01
Posición
Set out the foundation locations against the project layout.
02
Instalar
Use matched equipment and the agreed installation method.
03
Conectar
Review levels and attach the specified connection.
02
Project information
Make the review specific.
Use this checklist to prepare the information for your enquiry.
| Review area | Information to share |
|---|---|
| Application | Structure type, support arrangement and connection |
| Site | Location, access and available soil information |
| Product | Proposed model, quantity and dimensional requirements |
| Records | Available drawings, reports and installation information |