Главная / About Lidaer

Lidaer ground screw systems

From steel to a finished foundation component .

Follow the sequence from incoming material through forming, welding, galvanizing and final inspection.

01 / Lidaer

A sequence with checks at each stage.

01
Material and forming

Review incoming materials and prepare the product components.

02
Fabrication and finishing

Complete the specified connection, welding and surface treatment.

03
Inspection and packing

Check the completed products and prepare the order for dispatch.

02

Production sequence

Follow the product through the process .

Stage Review focus
01 / Incoming material Material information and applicable specification
02 / Cutting and forming Component dimensions and profile
03 / Drilling and welding Connection geometry and fabrication
04 / Surface treatment Agreed treatment and inspection requirements
05 / Final inspection Model, dimensions and completed product
06 / Packing Protection, identification and order list
03

Continue exploring

See how the pieces fit together .

Start a conversation

Let’s find the right system.

Share the application, site information and connection requirements. Our team can help you prepare the next step.

Поговорите с нашей командой