Lidaer ground screw systems
From steel to a finished foundation component .
Follow the sequence from incoming material through forming, welding, galvanizing and final inspection.
01 / Lidaer
A sequence with checks at each stage.
01
Material and forming
Review incoming materials and prepare the product components.
02
Fabrication and finishing
Complete the specified connection, welding and surface treatment.
03
Inspection and packing
Check the completed products and prepare the order for dispatch.
02
Production sequence
Follow the product through the process .
| Stage | Review focus |
|---|---|
| 01 / Incoming material | Material information and applicable specification |
| 02 / Cutting and forming | Component dimensions and profile |
| 03 / Drilling and welding | Connection geometry and fabrication |
| 04 / Surface treatment | Agreed treatment and inspection requirements |
| 05 / Final inspection | Model, dimensions and completed product |
| 06 / Packing | Protection, identification and order list |
Start a conversation
Let’s find the right system.
Share the application, site information and connection requirements. Our team can help you prepare the next step.