Home / Resources

Lidaer ground screw systems

What information is needed to select a ground screw?

Bring the structure, the site and the installation method into the same conversation.

Lidaer team installing ground screws with a tracked hydraulic machine

The most useful starting point is a clear description of the project and the information already available.

01. Describe the structure.

Share the type of structure, its footprint and the intended support arrangement. Drawings help explain how posts, beams or base plates connect to the foundation.

Lidaer cabin reference

02. Describe the site.

Include the project location, site photographs and any available ground investigation. Tell the team about access constraints and other conditions that may affect the review.

03. Discuss installation.

The product and installation equipment need to be considered together. Include the intended installation approach, available equipment and proposed quantities.

04. Prepare your enquiry.

IncludeUseful starting information
StructureLayout and connection drawings
SiteLocation, photographs and available ground report
SupplyProposed quantity and destination
SupportQuestions about selection, installation or documentation

This guide introduces enquiry preparation. It does not replace a project-specific foundation design.

Start a conversation

Let’s find the right system.

Share the application, site information and connection requirements. Our team can help you prepare the next step.

Talk to our team